AT THE HEART OF THE ROAD TRANSPORT INDUSTRY.

Call our Sales Team on 0208 912 2120

Two decks for City Link

8th November 2007
Page 7
Page 7, 8th November 2007 — Two decks for City Link
Close
Noticed an error?
If you've noticed an error in this article please click here to report it so we can fix it.

Which of the following most accurately describes the problem?

NEXT-DAY DELIVERY specialist City Link has taken delivery of 70 Gray & Adams dry-freight double-deck trailers from Fraikin in a 10-year contract-hire deal.

The 13.6m trailers have an interior height of 2.06m on the upper deck and 1.9m on the lower deck; 2m-deep powered loading ramps form the lower rear closure with double rear doors forming the upper closure.

An interior two-tonne tail-lift is housed within the rear doors.

The deal, worth over Elm per year, includes servicing and maintenance as well as tyres and breakdown support.