ROADWORKS
Page 31

If you've noticed an error in this article please click here to report it so we can fix it.
M61: J5-6, lane 3 and hard shoulder closures on both carriageways; 50mph limit, until June.
M63: J9-11, contrafiow with 50mph limit; J11 northbound access sliproad closed, until March.
Al (M): J34-5, southbound carriageway closed with contraflow on the northbound carriageway, until March.
Al2: Suffolk to Springfield to Marks Tay, lane closures overnight and during offpeak hours, until 22 February.
M1/A564: Derby Southern
Bypass, construction of a new junction and bridge, delays until May 1997. M6:129-32, delays caused by road widening and improvement work until August.
M25: J7-8, widening work, three lanes to be kept open at all times but severe delays expected; 50mph limit. M50: J1-2, bridge strengthening, westbound carriageway closed until March with a contraflow, until June.
• For the latest road news around the UK simply contact one of the following AA Hotline numbers (calls cost 36p/min off-peak; ittlp at al other times):
West Country; (01836) 401 111 Wales: (01836) 401 112. Midlands: 01836) 401 113. Ea st Anglia: (01836) 401 114 North-West: (01836) 401 115 North-Ease 1018361401 116. Scotland: (01836) 401 117 N Ireland: 1018361401 118 London: (01836) 401 122. M4-MI: (01836) 401 123 M1-Dartford: (01836) 401 124. Dartford-M23: (01836) 401 125 M23-M4: (01836) 401 126. M25: (01836) 401 127.