AT THE HEART OF THE ROAD TRANSPORT INDUSTRY.

Call our Sales Team on 0208 912 2120

Wheel removal Linford Engineering Co Ltd. Unit 6, Alders Drive,

31st August 1979, Page 24
31st August 1979
Page 24
Page 25
Page 24, 31st August 1979 — Wheel removal Linford Engineering Co Ltd. Unit 6, Alders Drive,
Close
Noticed an error?
If you've noticed an error in this article please click here to report it so we can fix it.

Which of the following most accurately describes the problem?

Moon% Moat, Redditch, Worcester. shire, now has available thE Linford wheel dolly which is de signed to simplify the removal o. truck and bus wheels or hut assemblies.

The vehicle is jacked up be low the wheel or pair of wheek to be removed. The suppor arms are then raised to take the weight of the wheel (or wheels), the retaining chain is wrappec around the wheel and securec the wheel nuts removed, the support arms tilted to the correct angle and the dolly carriage complete with wheel may be pulled back.

Tvlio models are available, 70014g (13.8cwt) and 1100kg 21. cwt). With the 700kg nod I load levellers are incor)(mated to facilitate proper ilignment and minimise the risk )f damage to bearings, grease ir oil seals or anti-skid sensors if he d Ily is used to fit wheel and lub assemblies.

lift range of the support irms of both models is 0-20cm 77/Eii ) and both have built-in Pays that may be used for tools 1r pa s. The arms are raised and )we d hydraulically and four este on the base of the dolly How it to be moved easily. Price f th 700kg model ex works is 28 +VAT while the 110kg lod I is £310 +VAT ex works.