18th August 1967, Page 52
18th August 1967
Page 52
Page 52, 18th August 1967
Close
Know-how 38: Preventive Maintenance (23)--operating Hazards
L HAVE outlined some of the main features 11of unscheduled repair arising from the mechanical side. Now we must be prepared to find almost an equal amount of unplanned repair......
Custom-built Aec Recovery Vehicles
rr WO new recovery vehicles capable of towing 56-ton loads have been constructed from AEC CKD kits in the Basildon workshops of CV (Sales and Repairs) Ltd., Essex distributors......